First, the work of staff in the use of compulsory concrete mixer that day after the completion of bulk cement tank should shut the gate, the inner spiral conveying cement all out; do any residual cement in the tube.
Second,clean all parts of slurry concrete mixing machine, fouling. Stirred tank and cleaned the whole surface of the dust, and grease buildup of concrete to prevent the concrete dry, keep it clean. After the end of the production, to promptly stop the mixer thoroughly cleaned before the remnants of concrete, will shut down all operations position switch to disconnect and turn off the entire power switch.
Third, concrete mixing drum forced mixer must be cleaned. Perform maintenance on machinery for filling oil lubrication points on the need to protect the part of the oiled rust.
Some customers think long after the completion ofmini concrete mixer down the line, in fact, this idea is wrong, for the timely elimination of security risks concrete mixers, blenders ensure good condition, so after the stoppage to be well maintained, it will not be regular some small problems.
Oct 30, 2019
Nov 30, 2024
Nov 29, 2024